Public Works
Project Status Updates
Following is a list of projects currently managed by Public Works as of June 2008. Click on the project name to access a description and scheduling information.
CONSTRUCTION PROJECTS- Aqui Esta Drive Improvements
- ATMS/FDOT Traffic Signal System Upgrade
- Burnt Store Road Widening Project - Phase 1
- Burnt Store Road Widening Project - Phase 2
- Cape Haze Drive Bridge Replacement
- Carmalita Widening - Phases I and II
- Coral Creek Bridge Replacement
- Edgewater/Flamingo Corridor - Phase I
- Fordham Waterway Bridges at US 41 Service Roads
- Grove City Walking Park
- Kings Highway Widening
- Manchester Lock Removal Project
- Michael Kosinski Bridge Replacement
- Midway Boulevard Widening
- Peachland Boulevard Sidewalks
- Piper Road Widening
- South County Sidewalks
- Toledo Blade Boulevard Widening
- US 41Charlotte Harbor Gateway, Phase I
- US 41 Revitalization - West Tarpon to Port Charlotte Boulevard
- Winchester Boulevard South
- Chancellor Drainage Redesign
- DOR 3.70 - Dorchester Water Control Structure
- ELK 2.67 - Elkcam Water Control Structure
- FOR 2.77 - Fordham Water Control Structure
- LIO 2.87 - Lionheart Water Control Structure
- Manasota Key Design and Permitting - Phase I
- Manasota Key Design and Permitting - Phase II
- MOR 3.91 - Morningstar Water Control Structure
- Rotonda Oakland Hills Culvert Replacement
- Rotonda Weirs
- SUN 4.27 - Sunset Water Control Structure
- Three Lakes Project/Lake 1 Excavation
