Public Works
Project Status Updates
Click on a project name below to access a description and scheduling information.
CONSTRUCTION PROJECTS- Aqui Esta Drive Improvements
- Burnt Store Road Widening Project Phase 1
- Burnt Store Road Phase 2 Design
- Burnt Store Road Widening Project Phase 3
- Cape Horn Entry Features
- Chamberlain Boulevard Bridge Rehabilitation
- Charlotte Harbor Gateway Harbor Walk Phase 1
- Coral Creek Bridge Replacement
- Edgewater/Flamingo Corridor Phase 1
- Edgewater Drive Widening Phase 2
- Elkcam Waterway Bridges Replacement
- Melbourne Bridge Replacement
- Midway Boulevard at West Spring Lake Bridge Rehabilitation
- Midway Boulevard Widening Phase 1
- Piper Road Widening North
- Piper Road Widening South
- Placida Road Widening
- Sales Tax Year One Sidewalks
- Sales Tax Year Two Sidewalks
- South Gulf Cove Entry Features
- Tom Adams Bridge Generator Replacement
- Lionheart Water Control Structure
- Manasota Key Drainage Phases 1 and 2
- Midway Boulevard Water Control Structures Phase 1
- National Pollution Discharge Elimination System
- Rotonda Weirs
- Sandhill DRI Wetland Restoration Project
- Three Lakes Project/Lake 1 Excavation
- Total Maximum Daily Load Program
- US 41 Storm Structures
- Water Control Structures LIO3.52, SUN4.70, and FOR3.86
- Water Quality Monitoring Program
DREDGING PROJECTS
- Alligator Creek S Curve Dredge
- Harbour Heights Waterway Maintenance Dredge
- Pirate Harbor Rock Removal
- South Bridge Waterway Dredge
- Stump Pass Maintenance Dredge
- Suncoast Waterway Maintenance Dredge
- Sunrise Waterway Dredge
- Trout Creek Breach Repair
