Public Works - Engineering

Project Status Updates

Click the items below to access more information on the projects.

Please note that designs, budgets and project dates are subject to change.

Projects MapGIS Mapping

Purchasing Bids CatalogFY 14 Adopted Capital Improvements Program (Budget)


CONSTRUCTION PROJECTS - may affect vehicular/boater/pedestrian traffic patterns
Note that Addenda to Bid Specs can be viewed on the Purchasing Bids Catalog page.
2014 Paving Program Bid Specs/Plans   Project Map
Burnt Store Road Phase III Construction
     › Construction Update - Feb. 18, 2014
     › Renderings from Public Meeting - March 26, 2013
Bid Specs/Plans Budget

Project Map

Dredging - Northwest Port Charlotte Waterways Bid Specs/Plans Budget Project Map
Harborview Road Bridge Replacement
     › Temporary Bridge and Road System
Bid Specs/Plans Budget Project Map
Sidewalk - Gardens of Gulf Cove Sidewalks Bid Specs/Plans Budget  
Sidewalk - Rotonda Boulevard Sidewalks (East & North) Bid Specs/Plans Budget Project Map
Sunshine Lake Algae Removal Bid Specs/Plans Budget Project Map
US 41 Microtunnels / Weirs
     › U.S. 41 Road Closures at Pompano Waterway
Bid Specs/Plans Budget
Winchester Boulevard South
     › Winchester Alignment - Map
Bid Specs/Plans Budget Project Map

PROJECTS IN DESIGN OR NEGOTIATION

Construction Projects:
Charlotte Harbor Gateway Harbor Walk Phase 1
     › Gateway Harbor Walk Concept Plan - Phases 1 and 2
  Budget
Charlotte Harbor Gateway Harbor Walk Phase 2   Budget
CR 771 (Gasparilla Road) Widening
     › Renderings from Public Meeting - May 21, 2013
  Budget
Edgewater Drive Widening Phase Two
     › Contractor's Project Website
  Budget
GPC Bridge Rehabilitation - Sheehan Blvd Over Yale Waterway   Budget
Midway Boulevard Widening Phase Two - Sharpe Street to Kings Highway   Budget
Parkside - Harbor Blvd. Improvements (US 41 to Olean Blvd.)   Budget
Placida Road Phase 1 - Rotonda Blvd. West to Cape Haze Drive   Budget
Placida Road Phase 2 - Cape Haze Drive to Boca Grande Causeway   Budget
Tom Adams Bridge Rehabilitation Phase Two
     › Renderings from Public Meeting - January 16, 2013
  Budget

Coastal Projects:
Dredging - Alligator Creek Maintenance Dredging   Budget
Dredging - Alligator Creek -6 Feet Dredging   Budget
Dredging - Buena Vista Grassy Point Maintenance Dredging   Budget
Dredging - Gulf Cove Waterway Maintenance   Budget
Dredging - Harbor Heights Waterway
     › Project Schedule
  Budget
Dredging - Manchester Waterway Bid Specs/Plans Budget
Dredging - Pirate Harbor Access Channel   Budget
South Gulf Cove Turn Basin   Budget

Stump Pass Monitoring & Maintenance Dredging
     › 10-Year Beach & Inlet Management Plan
     › Erosion Control Drawings
     › Project Description
     › Alternatives Analysis Report - Jan. 14, 2014
     › Key Elements: 10-Year Management Plan - March 31, 2014

  Budget

Drainage Projects:
Charlotte Harbor Stormwater Structures Phase 2   Budget
Little Farm Road Culverts Bid Specs/Plans Budget
Newgate Waterway Spoil Removal   Budget

Stormwater Control Structure Replacement - Dorchester Waterway (Kenilworth Blvd.)

  Budget  
Stormwater Control Structure Replacement – Fordham Waterway (Peachland Blvd.)   Budget  

Stormwater Control Structure Replacement – Fordham Waterway (Quasar Blvd.)

  Budget  

Stormwater Control Structure Replacement - Niagra Waterway (Peachland Blvd.)

  Budget  

Stormwater Control Structure Replacement – Niagra Waterway (Quasar Blvd.)

  Budget  
Stormwater Control Structure Replacement - Sunset Waterway (Forrest Nelson Blvd.) Bid Specs/Plans Budget  

Sidewalk Projects:
Sidewalk - Burnt Store Lakes   Budget  
Sidewalk - Oceanspray Boulevard Sidewalks   Budget Project Map
Sidewalk - Parkside - Elkcam Boulevard Multi-Use Path   Budget  
Sidewalk - Rotonda Boulevard Sidewalks (West)   Budget  
Sidewalk - Sheehan Boulevard Sidewalks   Budget Project Map
Sidewalk - South Gulf Cove   Budget  

OTHER PROJECTS
DeSoto Canal Bank Restoration Phase 2   Budget
Electric Runs to Rotonda West Bridges Bid Specs/Plans Budget
Manasota Key Community Plan Design Bid Specs/Plans Budget
National Pollutant Discharge Elimination System   Budget
Rotonda West Entry Features Bid Specs/Plans Budget
Sunshine Lake Recharge Wells   Budget
Sunshine Lake Water Level Control Structure   Budget