*** This website is currently being updated. The information posted on this website is a general guideline for the application of permits. There may be other requirements needed for certain permits that are not currently listed on this website. For additional information, please call: 941-743-1201.***

How do I Apply for a Permit for ...
Click on a letter, A through Z, to link to permitting information on a subject that begins with that letter; for example, P for Pools.

  Index of Topics

A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z  

 

Tents

Required Forms, Documents, and Fee Schedule:
Notes:
  • A special event permit is required if tent is not on owner's property.
  • The dates of when the tent will be constructed and removed will be required.
  • Apply for Special Event Permit in Zoning. The permit is issued immediately.
  • If putting in electric, a separate electrical permit is required.
Inspections Required & Inspection Code Numbers:

*** The inspections posted on the website are a general guideline. Inspections that are required may vary from structure to structure and are determined at the time of Plans Review. It is suggested that a call be placed to inspection dispatch (941.743.1204 or 941.743.1205) before concrete is poured, any work is covered up, or if there are any questions regarding inspections to ensure that correct inspections are scheduled. ***

  • Fire Final – 937  Inspector will check for fire extinguishers, flame retardant label, tie downs and site location

Top of Page

Water Conditioner - No longer requires a permit, however, a plumbing and/or electrical permit may be required.

Top of Page

Wall (boundary wall, landscaping wall)

Required Forms, Documents, and Fee Schedule:
Notes:
  • Reviews will be performed by Building, Zoning and Right-Of-Way.
Inspections Required & Inspection Code Numbers:

*** The inspections posted on the website are a general guideline. Inspections that are required may vary from structure to structure and are determined at the time of Plans Review. It is suggested that a call be placed to inspection dispatch (941.743.1204 or 941.743.1205) before concrete is poured, any work is covered up, or if there are any questions regarding inspections to ensure that correct inspections are scheduled. ***

  • Footing Inspection – 230 (if wall is over 2 feet)
  • Building Fill Cells – 203 (if wall is over 4 feet)
  • Seawall – 209 (If 8 feet or over)
  • Building Final - 925
  • Right-Of-Way Final -985

Top of Page

Wall - Interior

Required Forms, Documents, and Fee Schedule:
Notes:
  • Reviews will be performed by the plans examiner.
  • Electric, Plumbing and Air Conditioning can be included with this permit.
Inspections Required & Inspection Code Numbers:

*** The inspections posted on the website are a general guideline. Inspections that are required may vary from structure to structure and are determined at the time of Plans Review. It is suggested that a call be placed to inspection dispatch (941.743.1204 or 941.743.1205) before concrete is poured, any work is covered up, or if there are any questions regarding inspections to ensure that correct inspections are scheduled. ***

  • Building Rough - 200
  • Insulation - 281, if applicable
  • Electric Rough - 300
  • Plumbing Rough – 700
  • HARV Rough – 400, if applicable
  • Building Final - 925
  • Electric Final – 935
  • Plumbing Final – 975
  • HARV Final – 945, if applicable

Top of Page

Water Heater

Required Forms, Documents, and Fee Schedule:
Notes:
  • By Florida Building Code, water heaters must be hard wired when installed. The electrical work necessary to connect the water heater to the water heater disconnect does not require a permit.
  • A separate electrical permit is required if the water heater is moved to a new location, or a second water heater or larger capacity heater is installed.
Inspections Required & Inspection Code Numbers:

*** The inspections posted on the website are a general guideline. Inspections that are required may vary from structure to structure and are determined at the time of Plans Review. It is suggested that a call be placed to inspection dispatch (941.743.1204 or 941.743.1205) before concrete is poured, any work is covered up, or if there are any questions regarding inspections to ensure that correct inspections are scheduled. ***

  • Plumbing Final - 975
  • Electric Final - 935, if applicable

Top of Page

Windows (go to Doors and Windows)

Top of Page