Project Status Updates
Click on a project name below to access a description and scheduling information. Several of the projects have maps or pictures available by clicking on the Attachments tab to the left of the project page.
CONSTRUCTION PROJECTS- Burnt Store Road Widening Project Phase 1
- Burnt Store Road Widening Project Phase 3
- Charlotte Harbor Gateway Harbor Walk Phase 1
- Cheney Brothers Site Roadway Improvements
- CR 771 (Gasparilla Road) Widening
- Edgewater Drive Widening Phase 2
- Harborview Road Bridge over Desoto Canal
- Midway Boulevard Phase 2- Scotten Street to Kings Highway
- Piper Road Realignment at Jones Loop Intersection
- Piper Road Widening North
- Placida Road Safety Improvements
- Rampart Boulevard Improvement Project
- Tom Adams Bridge Rehabilitation Phase 2
- Winchester Corridor Phase 3
- 2010 Greater Port Charlotte Water Control Structures
- Adopt-A-Pond
- Charlotte Harbor Community Redevelopment Area Culverts
- DeSoto Ditch Bank Stabilization
- Elmira/Pompano Waterway Structure
- GPC Water Control Structures - MOR4.42 and DOR4.22
- National Pollutant Discharge Elimination System
- Rotonda West Drainage Study
- Sunshine Lake Water Quality Study
- Three Lakes Project/Lake 1 Excavation
- Total Maximum Daily Load Program
- US 41 Storm Structures
DREDGING PROJECTS
- Northwest Port Charlotte Access Channels
- Pirate Harbor Rock Removal
- South Bridge Waterway Maintenance Dredge
- Stump Pass Ten-Year Management Plan
- Suncoast Waterway Maintenance Dredge
MUNICIPAL SERVICES BENEFIT UNIT PROJECTS (MSBU)
- Manchester Lock Education
- Parade Circle Pathways - Rotonda West
- Rotonda Electric to Bridges
- Rotonda West Entry Signage
- South Burnt Store Lighting & Landscaping
- South Gulf Cove Water Quality
- 2011 Countywide Paving Program
- 2012 North County Paving Program
- 2012 West County Paving Program
- Bermont Road Safety Improvements
SIDEWALK PROJECTS
- Parkside - Elkcam 10' Multi Use Path
- Sales Tax Year One (Florida Street) Sidewalks
- Sales Tax Year Two (Beacon Drive) Sidewalks
- Sales Tax Year Two (Cape Haze Drive) Sidewalks
- Sales Tax Year Two (Capricorn Blvd) Sidewalks
- Sales Tax Year Two (Gulf Stream Blvd) Sidewalks
- Sales Tax Year Two (Sheehan Blvd) Sidewalks
- Sales Tax Year Three (Aaron Street) Sidewalks
- Sales Tax Year Three (Bayshore Road) Sidewalks
- Sales Tax Year Three (County Road 74) Sidewalks
- Sales Tax Year Three (Deep Creek Blvd) Sidewalks
- Sales Tax Year Three (Ellicot Circle) Sidewalks
- Sales Tax Year Three (Harbor Blvd) Sidewalks
- Sales Tax Year Three (Oceanspray Blvd) Sidewalks
- Sales Tax Year Three (Rio De Janeiro Drive) Sidewalks
- Sales Tax Year Three (Riverside Drive) Sidewalks
- Sales Tax Year Three (Sandhill Blvd) Sidewalks
- Sales Tax Year Three (Sunnybrook Blvd) Sidewalks
- Sales Tax Year Three MSBU (E. Rotonda Blvd) Sidewalks
- Sales Tax Year Three MSBU (N. Rotonda Blvd) Sidewalks
- Sales Tax Year Three MSBU (W. Rotonda Blvd) Sidewalks
- Winchester and Flamingo Signalization