*** This website is currently being updated. The information posted on this website is a general guideline for the application of permits. There may be other requirements needed for certain permits that are not currently listed on this website. For additional information, please call: 941-743-1201.***

How do I Apply for a Permit for ...
Click on a letter, A through Z, to link to permitting information on a subject that begins with that letter; for example, P for Pools.

  Index of Topics

A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z  

Residential Addition

Required Forms:

Notes: Energy Calcs are required for air conditioning, heating and insulation. An application fee will be required which will be applied toward the valuation and project specific inspection fees. Reviews will be performed by Right-Of-Way, Zoning and Building Plans.

Someone must be present to allow the inspector in.


Inspections Required:
  • Plumbing Rough-if applicable
  • Conduit-if applicable
  • Deck - for new roofs
  • Dry-in-for new roofs
  • Electrical Rough-if applicable
  • Building Rough
  • Plumbing Tub-if applicable
  • HARV Rough-if applicable
  • Right-Of-Way Final
  • Building Final
  • Electrical Final-if applicable
  • HARV Final-if applicable
  • Plumbing Final-if applicable
  • Roof Final

Top of Page

Residential Sunroom

Required Forms, Documents, and Fee Schedule:
  • Application
  • Notice of Commencement - if job value is $2,500 or more
  • Owner/Builder Affadavit - if owner
  • Subcontractor Worksheet - if applicable
  • 2 Sets of Energy Calculations, when applicable
  • 3 Sets of Site Plans (1 for Right-Of-Way)
  • 2 Sets of Window and Door Specifications
  • 2 Sets of Signed and Sealed Plans OR
        Florida Building Code Prescription Design Manual Used, specifying Category Type (I, II, III, IV or V)
  • 2 Sets of Truss Layouts (if not aluminum)
  • 2 Sets of floor plan of existing house
Notes:
  • Reviews will be performed by Right-Of-Way, Zoning, and Building Plans Examiners.
Inspections Required & Inspection Code Numbers:

*** The inspections posted on the website are a general guideline. Inspections that are required may vary from structure to structure and are determined at the time of Plans Review. It is suggested that a call be placed to inspection dispatch (941.743.1204 or 941.743.1205) before concrete is poured, any work is covered up, or if there are any questions regarding inspections to ensure that correct inspections are scheduled. *** AIRS Brochure

  • Building Rough - 200
  • Building Slab - 201
  • Building Wall Sheath - 216 (if applicable)
  • Complete Insulation - 281
  • Electric Rough - 300
  • Roof Dry In - 501
  • Renail/Decking - 505 (if applicable)
  • Complete Insulation
  • Right-Of-Way Final - 985 (if applicable)
  • Roof Final - 955
  • Electric Final - 935
  • Windborne Debris Final - 918
  • Building Final - 925

Top of Page

Right-Of-Way

Required Forms:

 


Notes:

Driveway installations, reinstallations or resurfacing, culvert pipe, sod and/or sprinkler installations require a right-of-way permit. Additional inspections may be required depending of the type of work being performed. All right-of-way permits will require a right-of-way review.


Inspections Required: Right-Of-Way Final

Top of Page

Rip Rap Seawall

Required Forms:

Notes: An application fee will be required which will be applied toward the valuation and project specific inspection fees. Reviews will be performed by Right-Of-Way and Zoning.

Inspections Required: Right-Of-Way Final - if applicable

Top of Page

Re-Roof for Existing Roofs

Required Forms:

Notes: An application fee will be required which will be applied toward the valuation and project specific inspection fees. This permit is generally issued immediately.

Inspections Required:
  • Deck - if replaced.
  • Dry-In - if tear off
  • Final Roof

Top of Page

Roofing (New, never existing roof)

Required Forms:

Notes: An application fee will be required which will be applied toward the valuation and project specific inspection fees. A review will be performed by the Building Plans Examiners.

An owner can not build a roof if over a duplex if they do not reside in the duplex.


Inspections Required:
  • Deck Inspection
  • Framing Inspection
  • Dry-In and/or in progress inspection if applicable
  • Roof Final

Top of Page

Roof Overs

Required Forms:

Notes: Engineering must be on jobsite for inspection. An application fee will be required which will be applied toward the valuation and project specific inspection fees. A review will be performed by the Building Plans Examiners.

Membrane roof systems on mobile homes will require an permit to assure inspections.


Inspections Required:
Final Roof

Top of Page

Seawalls

Required Forms:

Notes: An application fee will be required which will be applied toward the valuation and project specific inspection fees. Reviews will be performed by Building, Right-Of-Way and Zoning.

If the lot is vacant an owner/builder must reside in the area.


Inspections Required:
  • Footing Inspection (if applicable)
  • Seawall Cap Inspection
  • Building Final
  • Right-of-Way Final

Top of Page

Sheds

Required Forms, Documents, and Fee Schedule:
Notes:
  • All Sheds shall be within proper set backs and constructed per manufacturers specifications
  • Shed needs to be STD 10.02 FBC
  • Reviews will be performed by Zoning and Building Plans Examiners.
Inspections Required & Codes:

*** The inspections posted on the website are a general guideline. Inspections that are required may vary from structure to structure and are determined at the time of Plans Review. It is suggested that a call be placed to inspection dispatch (941.743.1204 or 941.743.1205) before concrete is poured, any work is covered up, or if there are any questions regarding inspections to ensure that correct inspections are scheduled. *** AIRS Brochure

Building Slab - 201 (if applicable)
Building Wall Sheath - 216
Electrical Rough - 300 (if applicable - if wiring of electric is installed, a separate electrical permit may be required)
Building Footer - 230
Building Final - 925
Electrical Final - 935 (if applicable)

Top of Page

Sheds - DCA Approved over 100 sq. ft.

Required Forms, Documents, and Fee Schedule:
  • Application
  • Owner/Builder Affidavit - if by owner 
  • Subcontractor Worksheet - if subcontracting
  • Notice of Commencement - if value is $2,500 or more
  • 2 Sets of site plans identifying the location of the shed, adjacent buildings, easements, etc. with appropriate dimensioning
  • 2 Sets of plans Engineering or Specs (if aluminum)
  • 2 Copies of a Survey
  • DCA letter approving and authorizing the manufacturer of the shed to install the shed.
  • A DCA Plan Tracking Number from the shed manufacturer or from the website must be submitted.
  • 2 Copies of Signed and Sealed foundation/anchoring detail, which may be an approved County Master Plan.
Notes:
  • All Sheds shall be within proper set backs and constructed per manufacturers specifications
  • Shed needs to be STD 10.02 FBC
  • Reviews will be performed by Zoning and Building Plans Examiners.
  • In addition to the necessary forms for permitting, the approved permit package will include County stamped documents for the building and anchoring of the shed, and approved site plans with the DCA Plan Tracking Number from the information provided with the permit application. These items must be provided on the job site.
Inspections Required & Codes:

*** The inspections posted on the website are a general guideline. Inspections that are required may vary from structure to structure and are determined at the time of Plans Review. It is suggested that a call be placed to inspection dispatch (941.743.1204 or 941.743.1205) before concrete is poured, any work is covered up, or if there are any questions regarding inspections to ensure that correct inspections are scheduled. *** AIRS Brochure

For the on site inspection, the building interior will have to be made available to the inspector for examination of the Insignia contained therein, and anything else that may require inspection.
Building Slab - 201 (if applicable)
Building Wall Sheath - 216
Electrical Rough - 300 (if applicable - if wiring of electric is installed, a separate electrical permit may be required)
Building Footer - 230
Building Final - 925
Electrical Final - 935 (if applicable)

Top of Page

Signs

Required Forms:
Notes: An application fee will be required which will be applied toward the valuation and project specific inspection fees. A site inspection will be performed prior to permit approval. Reviews will be performed by Code Enforcement, Zoning and Building Plans Examiners.

If sign is illuminated an additional fee is required along with the Electrical subcontractors name on the worksheet.

An existing sign with a Face change out does not require a permit.


Inspections Required:
  • Concrete Footing-if applicable
  • Building Final
  • Electrical Final-if applicable
  • Zoning Final

Top of Page

Single Family Residence

Required Forms:

Notes: Must have letter from owner if not air conditioned. If in the Englewood Fire District a copy of the fire impact fee receipt is required at the time of application. Septic permit can be applied for through Permitting. An application fee will be required which will be applied toward the valuation.

Reviews will be performed by Right-Of-Way, Zoning, Tree, Addressing and Building Plans Examiners.

If in a flood zone an Elevation Certificate is required prior to lintel inspection.  

The following must be completed before finals will be dispatched: 

  • All re-inspection fees paid 
  • Impact Fee Paid Garbage fee Paid 
  • Termite Certificate - Pre-treat and Final 
  • Health Approval (if applicable)
  • Engineering Approval (if applicable)
  • FEMA (if in a flood zone)

Inspections Required:
  • Plumbing Rough-PVC & Copper in, drain pipe test
  • Building Slab/Footings-Steel, Mesh, Visqueen in place, bug spray sticker.
  • Building Lintel-all blocks, forms and steel in place
  • Mechanical Rough-duct work in
  • Electrical Rough-boxes mounted, wire in place and cut in, service set and wired.
  • Plumbing Tub-Tub set, extend all copper, complete waste & vent pipes, and water pipes including tub valves
  • Building Rough-tie down trusses and bearing walls, fill lintel downpours, trusses engineered, plywood down.
  • Complete Insulation-insulation and baffles in place
  • Roof Deck
  • Roof Dry In (if flat deck or tile roof)
  • Building Final
  • Electrical Final
  • HARV Final 
  • Plumbing Final
  • Plumbing Sewer 
  • Plumbing Water
  • Well Inspection (if applicable)
  • Right of Way Line & Grade
  • Right of Way Pipe
  • Grade Final
  • Tree Final
  • Right of Way Final
  • Roof Final

Top of Page

Slab

Required Forms:

Notes: Do not order concrete until the slab inspection has passed. An application fee will be required which will be applied toward the valuation and project specific inspection fees. Reviews will be performed by Right-Of-Way, Zoning and Building Plans Examiners.

If slab is butting against a residence it must be sprayed for termites and a Termite Certificate is required.


Inspections Required:
  • Building Slab-required before the cement is poured with the forms & reinforcements visible, termite protection and compaction results.
  • Right of Way Final

Top of Page

Solar Heat - No longer requires a Permiting

Top of Page

Spa/Hot Tub - In Ground 

(for above ground spas, refer to Pools - Above Ground)

Required Forms:

Notes: An application fee will be required which will be applied toward the valuation and project specific inspection fees. Reviews will be performed by Right-Of-Way, Zoning and Building Plans Examiners.

If this spa or hot tub is in the lanai area, someone will have to be home so the Inspector can check wiring and over current protection.


Inspections Required:
  • Building Slab- if deck is involved
  • Electrical Rough
  • Right-Of-Way Final - if applicable
  • Building Final
  • Electrical Final

Top of Page