Building Construction Services
*** This website is currently being updated. The information posted on this website is a general guideline for the application of permits. There may be other requirements needed for certain permits that are not currently listed on this website. For additional information, please call: 941-743-1201.***
ElectricResidential can be issued using "On-Line Permitting" |
|||||
| Required Forms & Documents: |
|
||||
| Notes: | This permit is issued immediately.
All re-inspection fees must be paid prior to finals. Someone will
have to be home to allow the Inspector inside. For a service change, you will have to set a time to coordinate with F.P.L for re-connect. |
||||
| Inspections Required: | Electrical Rough (If applicable) Conduit Inspection (If applicable) Electrical Final | ||||
Fences - Commercial or Residential Corner Lots |
||
| Required Forms & Documents: |
|
|
| Notes: | An application fee will be required which will be applied toward the valuation. A Zoning review and fee is required for residential and commercial lots. A Fire review will also be required for commercial lots. Easements and height requirements may dictate fence placement. |
|
| Inspections Required: |
|
|
Fire Alarm |
|
| Required Forms & Documents: |
|
| Notes: | A Fire Alarm Technician shall be on site to assist the Fire Marshall. A review will be performed by Fire.
This work cannot be done by an owner - must use a licensed contractor. |
| Inspections Required: | Fire final only |
Fire Sprinkler |
|
| Required Forms & Documents: |
|
| Notes: | Reviewed by Fire Plans Examiner. Cannot be done by an owner - must use a licensed Fire Sprinkler contractor. |
| Inspections Required: |
|
Fire Wall |
||
| Required Forms & Documents: |
|
|
| Notes: | U.L. Fire Listing of wall is required. An application fee will be required which will be applied toward the valuation. Reviews will be performed by Zoning, Fire and Building Plans Examiners.
For framing inspection: Stud wall complete with electric, plumbing or duct work installed. Could be 2 or 3 inspections on Firewall depending on the hourly rating of the wall. |
|
| Inspections Required: |
|
|
Foundation Only Permit |
|
| Required Forms & Documents: |
|
| Notes: | A Building Plan Review will be required. |
| Inspections Required: |
|
Fuel Tanks & Pumps |
||
| Required Forms & Documents: |
|
|
| Notes: | An application fee will be required which will be applied toward the valuation. Reviews will be performed by Right-Of-Way, Zoning, Fire and Building Plans Examiners. In Ground tanks only require a Fire review. Inspection is performed by the Fire Inspector. Cannot be done be owner-must use a licensed contractor. |
|
| Inspections Required: |
|
|
Garage |
||
| Required Forms & Documents: |
|
|
| Notes: | An application fee will be
required which will be applied toward the valuation. Reviews will
be performed by Right-Of-Way, Zoning, and Building Plans Examiners.
If the garage is attached to an existing residence, a roofing contractor must be listed on the subcontractor sheet. The general contractor can only perform roof work if the garage is detached. |
|
| Inspections Required: |
|
|
Glass Room |
||
| Required Forms & Documents: |
|
|
| Notes: | An application fee will be required which will be applied toward the valuation. Reviews will be performed by Right-Of-Way, Zoning, and Building Plans Examiners. | |
| Inspections Required: |
|
|
Heat Pump For Pool Heater |
|
| Required Forms & Documents: | |
| Notes: | A Heat pump pool heat permit is issued immediately. All re-inspection fees must be paid prior to finals. |
| Inspections Required: | HARV Final |
Hood Suppression |
|
| Required Forms & Documents: |
|
| Notes: | Need valuation amount on application. A review will be performed by Fire.
Cannot be done by owner - must use a licensed fire contractor. |
| Inspections Required: | |
| Usually only fire final inspection. | |
Hurricane Shutters |
|
| Required Forms & Documents: |
|
| Notes: | Need valuation amount on application. A review will be performed by Plans Examiners. |
| Inspections Required: | |
| Building Final | |